Hon La InternationalMulti‑purpose Port

HomePort infrastructure

Two phases, six berths

Port infrastructure

Port infrastructure

Two phases, six berths

Phase 1 brings into operation two adjacent main berths and two berths for 7,000 DWT vessels. Phase 2 adds berths No. 3 and No. 4, raising capacity to 6 million tonnes per year. Bulk and project cargo vessels up to 70,000 DWT are accepted.

In operation

Phase 1

  • Berths2 main berths, 2 berths for 7,000 DWT vessels
  • Berth lengthBerth 1: 230 m · Berth 2: 240 m (470 m total)
  • General cargo and container vesselsup to 50,000 DWT
  • Bulk and project cargo vesselsup to 70,000 DWT
  • Planned capacity3 million tonnes/year
  • Shipping channel100 m wide, −11.2 m deep
  • Yardabout 105,000 m²
  • Warehouseabout 10,000 m²
  • StatusBerths 1 and 2 are both in operation
In preparation

Phase 2

  • Berths2 berths (No. 3 and No. 4)
  • Berth No. 3240 m
  • Berth No. 4260 m
  • Vessels acceptedgeneral cargo up to 50,000 DWT, bulk up to 70,000 DWT
  • Cumulative capacity6 million tonnes/year
  • Shipping channel120 m wide, −12.5 m deep
  • Yard and warehouseabout 58,000 m²
  • Expected scheduleConstruction 2027–2029, operation from 2030
6 million tonnes/yearPlanned capacity of the whole project after both phases