
General cargo handling
Receives general cargo vessels, containers and liquid cargo (excluding petroleum and LPG) up to 50,000 DWT, handled by a 45-tonne Liebherr multi-purpose crane. Serves machinery, supplies and import-export cargo.
The port serves cargo owners in Hon La Economic Zone and cargo flows passing along the Route 12A corridor.

Receives general cargo vessels, containers and liquid cargo (excluding petroleum and LPG) up to 50,000 DWT, handled by a 45-tonne Liebherr multi-purpose crane. Serves machinery, supplies and import-export cargo.

Receives bulk and project cargo vessels up to 70,000 DWT: coal, ore, wood chips, construction materials, agricultural products, equipment and structures. Wood chips are loaded onto vessels by conveyor at about 700 tonnes per hour.

Yards and warehouses for bulk, container and general cargo behind the berths. Phase 1 has about 105,000 m² of yard and about 10,000 m² of warehouse; phase 2 adds about 58,000 m². Includes a coal and ore blending area in an enclosed warehouse.

Coordinates road transport from the port to industrial parks and along National Highway 12A to the Cha Lo international border gate.
Rates for cargo handling, storage, warehousing and maritime services at the port, effective from 15/04/2026.