← Back to news
Channel dredging and completion of the coal handling system

Channel dredging has passed 86% of volume, and the coal conveyor system is undergoing trial runs before handover.

Channel dredging has passed 86% of volume, and the coal conveyor system is undergoing trial runs before handover.